rainbow logo RAINBOW BUILDING SERVICES
Complete Period Property Renovation 

1st Floor Flat Renovation

Internal Damp Problems, Resolved by cutting out render, raking out cracks and Filling.
Internal Damp Problems, Resolved by cutting out render, raking out cracks and Filling. *
Viewed: 323 times.

Replacing Storm drains and Guttering
Replacing Storm drains and Guttering *
Viewed: 286 times.

Replace Flat roof on to Bay window.
Replace Flat roof on to Bay window. *
Viewed: 290 times.

Re-skimmed all ceilings and walls. Special mounding made up and fitted in bay to period property.
Re-skimmed all ceilings and walls. Special mounding made up and fitted in bay to period property. *
Viewed: 323 times.

Replacement bay period panelling and remedial damp work carried out.
Replacement bay period panelling and remedial damp work carried out. *
Viewed: 341 times.

Removed existing reproduction georgian fireplace for correct period victorian fireplace.
Removed existing reproduction georgian fireplace for correct period victorian fireplace. *
Viewed: 343 times.

Replaced flat roof on dormer and aqua-sealed the firewalls on typical period mid terrace property.
Replaced flat roof on dormer and aqua-sealed the firewalls on typical period mid terrace property. *
Viewed: 317 times.

Fitted New Velux Windows
Fitted New Velux Windows *
Viewed: 318 times.

* Comments available for this item.
Powered by Gallery v1 rainbow logo RSS